Blog · 
2 November 2026
 · 
9 min read

Renovating? Electrical Things to Plan Before the Walls Close Up

Power points, lighting, switchboards, smoke alarms and prewiring for EVs and batteries: the electrical decisions to make before the plasterboard goes up.

Licensed electrician at work on an electrical installation

Renovations have a funny way of revealing what you never thought about. You spend weeks choosing tiles, benchtops and paint colours, then six months after moving back in you realise the only power point in the new kitchen island is on the wrong side, the bedside lamps are plugged into a tangle of extension leads, and there is nowhere to put an EV charger.

The cheapest time to get the electrical right is while the walls are open. Once the plasterboard goes up, every extra power point, cable run or light switch costs more, makes more mess and sometimes means cutting into the finish you just paid for.

Here is what to plan before the walls close up, from power point positions and lighting to switchboard capacity, safety rules and prewiring for the things you will want in five years.

Start with how you will actually live in the space

Electrical plans drawn from a template tend to put power points every few metres along the skirting. Real life is less tidy. Before you sign off the plan, walk through each room in your head and ask what will happen there.

Power points

  • Kitchen: where will the kettle, toaster, coffee machine, air fryer and mixer actually live? Islands usually need power, and an appliance cupboard with its own points keeps benches clear.
  • Bedrooms: double power points on both sides of the bed, at a height that suits bedside tables.
  • Living areas: think about where the TV, sound system, gaming console and lamps will go, including on walls you might mount a TV to.
  • Home office: more points than you think, plus a spot for the printer and router.
  • Bathrooms and laundry: heated towel rails, shaver points and hair tools, with positioning that respects the safety zones around water.
  • Garage: workshop tools, a second fridge or freezer, and charging for tools and bikes.

USB and data

Power points with built-in USB chargers are handy beside beds, at the kitchen bench and in the study. For data, a wired network connection to the TV, office and main living area is still more reliable than relying on Wi-Fi alone, and a central spot for the modem and network gear keeps the cables tidy.

One rule to know: data and phone cabling is regulated separately from electrical work. The Australian Communications and Media Authority requires cabling work to be done by a registered cabler, or by someone directly supervised by one. Ask your electrician whether they hold the registration, or coordinate with someone who does.

Quick tip: Print your floor plan, then draw on it where every appliance, lamp, TV and charger will sit. Bring that marked-up plan to your electrician. It is far more useful than "a few extra power points, please".

Lighting plans and dimmers

Lighting shapes how a renovated space feels, and it is very hard to change after the ceiling is sheeted.

  • Layer it. Combine general downlights with task lighting (under-cabinet strips in the kitchen, bathroom mirror lights) and feature lighting (pendants over the island, wall lights).
  • Think about switching. Two-way switches at both ends of hallways and stairs, switches at the right side of door swings, and separate switching for different zones of an open-plan room.
  • Dimmers. Not every LED light dims smoothly on every dimmer. Choose fittings and dimmers that are designed to work together, and confirm it before installation, not after.
  • Outdoor and security lighting. Sensor lights at entries, the driveway and side passages are easiest to wire during the build.
  • Smart lighting. If you want app or voice control, decide now. Some systems need neutral wires or specific switch boxes at each switch position.
Couple painting a wall during a home renovation
Once the walls are painted, every extra power point or cable run costs more. Plan the electrical first.

Check your switchboard can handle it

Renovations usually add load: a bigger kitchen with an induction cooktop, more air conditioning, a pool pump, maybe an EV charger later. All of that runs back to your switchboard, and older boards were never designed for it.

Signs your board may need attention include old ceramic fuses, no safety switches, a board with no space for new circuits, scorch marks or a burning smell, or circuit breakers that trip regularly. A licensed electrician should assess the board early in the planning stage, not on the day the kitchen goes in.

Safety switches are a big part of this. Queensland's Electrical Safety Office explains that since 2002, licensed electricians have not been permitted to do electrical installation work on a home without safety switches unless the work includes fitting them, with some exceptions. Under the current wiring rules, new residential work generally requires 30mA RCD protection on final subcircuits, and when a switchboard is replaced or existing circuits are altered, additional RCD protection must be installed. In practice, a renovation is often the moment the switchboard gets brought up to date.

Our switchboard upgrades page explains what an upgrade involves and when it is worth doing.

Open meter box and switchboard on a home
New kitchens, air conditioning and EV chargers all add load. Check the switchboard before you commit to the plan.

Smoke alarms: the 2027 rules apply to your renovation

From 1 January 2027, all Queensland homes must have compliant smoke alarms. According to Queensland Fire Department guidance, that means photoelectric alarms that are interconnected, either hardwired or powered by a non-removable 10-year battery, installed:

  • in every bedroom
  • in hallways that connect bedrooms to the rest of the home
  • on every storey, including at least one on the most likely exit path on a storey without bedrooms

The same guidance says new constructions and major renovations require hardwired 240-volt smoke alarms. A renovation is also the easiest time to get alarm positions right, because the cabling between them can run through open ceilings. If you are adding a bedroom, moving a hallway or adding a storey, make sure the smoke alarm layout is part of the electrical plan from the start.

For the full rundown, see our guide to the Queensland smoke alarm rules for 2027.

Prewire for the things you will want later

This is where a little planning saves a lot of money. Running a cable or conduit during a renovation costs a fraction of retrofitting it later.

EV charger

Even if an electric car is a few years away, consider running a suitable cable from the switchboard to the garage or carport now. Energex rules mean that dedicated home chargers drawing more than 20A on single-phase supply need some form of active management, such as an economy tariff with a network device or a dynamic connection. A three-phase supply opens up other options. Your electrician can plan around those rules so the charger is a simple job later. Our EV charger installation page covers the options.

Home battery

Batteries have strict location rules under the Australian battery installation standard (AS/NZS 5139). They cannot go in habitable rooms, ceiling spaces, wall cavities, under stairs or along an escape route, and there are clearance rules around doors, windows and appliances. If a battery is on your wish list, decide where it could go during the design and run conduit to that spot.

Solar and inverter

If solar is coming, plan the inverter position and a cable path from the roof to the switchboard. It is much neater to do this with the walls open.

Air conditioning

Split systems and ducted units usually need their own circuits from the switchboard. Plan indoor unit positions, outdoor unit positions and the cable and pipe routes between them. Leave space on the switchboard for the circuits.

Outdoor power

Weatherproof power points on the deck, near the barbecue, in the garden and by the pool equipment save a lot of extension lead juggling. Outdoor fittings need suitable weather ratings and safety switch protection.

Spare conduit

Empty conduit from the switchboard to the roof space, garage and main living areas is cheap insurance. It means future cables can be pulled through without opening walls.

Quick tip: Take photos of every wall and ceiling before the plasterboard goes on, with a tape measure in shot. Those photos show exactly where cables and conduit run, which helps anyone working on the house later.

Hire a licensed electrician and get your certificate

It is illegal for unlicensed people to do electrical work in Queensland. The Electrical Safety Office is blunt about it: even if you think you know what you are doing, unlicensed electrical work is dangerous and illegal. Homeowners can change light bulbs, reset safety switches and circuit breakers, and not much else.

When choosing an electrician for a renovation:

  • Check the licence. You can confirm an electrical contractor licence using the Queensland Government's electrical licence search.
  • Get them in early. Your electrician should be involved at the design stage, not called after the builder has framed everything.
  • Agree the plan in writing. A marked-up plan showing every point, light, switch and circuit avoids arguments later.
  • Ask for the certificate. In Queensland, an electrical contractor must give a certificate of testing and compliance as soon as possible after completing the work, confirming the installation has been tested and is electrically safe and compliant with the wiring rules. If you were not the one who engaged the electrician (for example, your builder was), it may go to the builder, so ask for a copy. Keep it with your house records.

Frequently asked questions

Do I need to upgrade my switchboard when renovating?

Not always, but it is common. If your board has old fuses, no safety switches or no room for new circuits, it will likely need work. Electricians cannot do installation work on a home without safety switches unless the work includes fitting them, with some exceptions.

Do I need hardwired smoke alarms for a renovation?

Queensland Fire Department guidance says new constructions and major renovations require hardwired 240-volt smoke alarms, and all homes must meet the interconnected photoelectric requirements from 1 January 2027.

Is it worth prewiring for an EV charger if I do not have an EV yet?

Usually, yes. Running a cable or conduit to the garage while walls are open is far cheaper than doing it later, and it makes the eventual installation quicker.

What paperwork should I get?

A certificate of testing and compliance for the electrical work, plus a copy of the final plan showing where everything runs.

Plan your renovation wiring before the plaster goes up

Josh is a licensed electrician who plans and installs the work himself, so the person who walks through your plans with you is the person who wires your home. Bring your floor plan and your wish list, and he will help you get power points, lighting, switchboard capacity and future-proofing right while it is still easy. Get in touch

Josh, licensed electrician and owner of Advance Energy
Questions? Talk directly to Josh
Licensed electrician and owner. Honest advice about what suits your home.

Related

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Your enquiry goes straight to Josh, a licensed electrician who designs and installs your system.
By submitting, you agree to Advance Energy contacting you about your quote.
Call Josh · 0474 505 395