Six signs your older solar system may need an upgrade, from an ageing inverter to a growing household, plus options and what 44c feed-in tariff customers should watch.

Remember when getting solar was the talk of every barbecue? Thousands of Brisbane homes put panels on the roof in the late 2000s and early 2010s, and many of those systems are still ticking away today.
But a system that suited your household back then may not suit it now. Your family has changed, your power use has changed, and the rules around feed-in tariffs and batteries have changed too.
With a new year about to start, it is a good moment to ask an honest question: is your solar still pulling its weight? Here are six signs it might be time for an upgrade, and the options worth considering.
Many systems installed around that time were small by today's standards, often only a few kilowatts. Panels have become more efficient since then, and household power use has generally grown.
Panels also slowly lose output with age. Modern panels typically degrade by around 0.5% a year, and older panels often faster. If your system is more than a decade old and your bill is still sizeable, a small array may simply not keep up with how you live now.
If you joined Queensland's Solar Bonus Scheme before it closed to new customers in July 2012, you may still be earning the 44c per kWh feed-in tariff. The Queensland Government confirms this tariff ends on 1 July 2028, provided you keep your eligibility until then.
That matters because certain changes can end your eligibility early, including:
For many 44c customers, the smart move is to plan an upgrade now and time it carefully, rather than make a change that ends a valuable tariff early. Always check with Energex before changing a 44c system.
Quick tip: Find an old bill and look for the feed-in rate. If it shows 44c, talk to a licensed electrician before you touch the inverter, panels or battery setup.
Panels often keep working for decades, but the inverter (the box that turns solar power into power your home can use) usually needs replacing at least once during the life of the panels. Industry guidance commonly puts a typical string inverter's life at around 10 to 15 years, depending on the model, installation and conditions.
Warning signs include:
Overdue for a check? Our guide to solar panel servicing in Brisbane explains what a proper inspection looks like.

What has changed since your solar went in?
Any of these can push usage well beyond what your system was designed for. An EV in particular adds a big load, and charging it from daytime solar is usually far cheaper than evening grid power.
A battery lets you store daytime solar and use it in the evening, when grid power is most expensive. But not every older system can add one easily.
You may need a battery with its own inverter, or a new hybrid inverter that manages both. A small, older array may not produce enough spare power to charge a battery in the first place.
The federal Cheaper Home Batteries Program provides a discount on eligible batteries. That discount drops on 1 January 2027 and then keeps stepping down every six months to the end of 2030, so if a battery is on your list for 2027, it is worth getting advice early in the year.
For more detail, read our guides on 5 things to know before installing a home battery and what size battery you need.

For most households not on the 44c tariff, feed-in rates in South East Queensland are now only a few cents per kWh, while the Energex Default Market Offer time-of-use peak rate (4pm to 9pm) for 2026 to 2027 is around 47.79c per kWh.
That gap is why using your own solar now matters far more than exporting it. Improving self-use, through a battery, a better-matched system or smarter timing, can do more than simply adding panels.
This can work if your inverter has spare capacity and your roof has room. Mixing old and new panels on the same inverter is not always straightforward, so you may need a separate inverter or microinverters for the new panels. Energex must approve changes, and 44c customers need to be especially careful.
If your panels are still performing well but the inverter is ageing or faulty, a replacement may be all you need. A hybrid inverter can also prepare your system for a battery later.
For very old, small systems, starting fresh with a properly sized, modern system is often the cleanest option. It can be designed around your current usage, roof and future plans, such as an EV or battery.
If your solar already generates more than you use during the day, a battery can help you use more of it in the evening. Battery sizing should be based on your actual usage, not a guess.
Quick tip: Before any upgrade, gather your last 12 months of power bills. They show how much you use and when, which is the starting point for designing the right system.
It can. Installing a larger inverter, adding panels beyond your inverter's capacity, or running a battery alongside your 44c system can all end eligibility. Get advice before making any change.
Sometimes. It depends on your inverter, how much spare solar you generate and whether you are on the 44c tariff. An electrician can check what will work with your setup.
It depends on your usage, system size and tariff. Our modelling for typical solar-only systems in Brisbane suggests a payback of around 5 to 8 years, but every home is different. See our Brisbane solar and battery pricing guide for more.
If your solar is getting older, your usage has grown or you are thinking about a battery, now is a good time to get clear advice. Josh will look at your current system, your bills and your plans, then recommend the upgrade that actually makes sense for your home, whether that is a new inverter, more panels, a battery or a fresh start. Book your free energy assessment with Advance Energy today.
Related