Building & property

New home electrical in Brisbane: wire it once, and get it right

Power, lighting and switching planned room by room, with a switchboard and cabling ready for solar, a battery and an EV charger from day one. Priced from your plans by a local licensed crew.

⭐ 5.0 Google rating · Licensed electricians · Based in Nundah

Advance Energy electrician drilling during an electrical install

When to call us

The cheapest time to get the electrical right is before the walls are lined. These are the moments we hear from new home builders.

You have plans or drawings

Send them through and we’ll price the electrical line by line, so you can compare like with like.

You choose your own electrician

If you’re an owner-builder, or your builder lets you bring your own sparky, we can quote and schedule around your build.

Knockdown rebuild or granny flat

New supply, a second dwelling on the block or a full rebuild, planned with the load you’ll actually run.

Solar, battery or EV on the list

Even if they’re a few years away, the cabling and switchboard space cost little now and a lot to retrofit.

What affects the price

Every new home is different, so we quote from your plans rather than guess. The main things that move the price are the size of the home, the number of power points and lights, the lighting you choose, the size of the switchboard, and how much solar, battery and EV preparation you want built in.

You get a line-by-line quote, so you can see exactly where the money goes and decide what to add now or later.

How it works

Three steps, and you deal with the electricians doing the work the whole way through.

Send your plans

Drawings, a rough layout or even photos of the site. Tell us what you want the home to do.

Layout and quote

We mark up the electrical, talk you through it and give you a clear quote before anything starts.

Rough-in, fit-off, test

The crew works to your build stages, tests everything and hands over your paperwork.

Common questions

When should I get an electrician involved in a new build?

At plan stage, before the slab if you can. That’s when conduit runs, the switchboard position and the space for a future inverter and battery get decided for free.

Is it worth making a new home solar-ready?

Yes. Cabling and switchboard space cost little at frame stage and a lot to retrofit through finished walls and ceilings.

Do new homes need interconnected smoke alarms?

Yes. New Queensland homes need hardwired, interconnected photoelectric smoke alarms in every bedroom, in hallways that connect bedrooms to the rest of the home, and on every level.

Can you install the solar, battery and EV charger too?

Yes. The same crew can wire the house and install the energy system, so it’s designed as one job rather than added on later.

How do you fit around my builder’s schedule?

We book rough-in and fit-off against your build stages and confirm with you or your builder before each visit.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Your enquiry goes straight to Josh, a licensed electrician who designs and installs your system.
By submitting, you agree to Advance Energy contacting you about your quote.
Call Josh · 0474 505 395