Building & property

Renovation electrician in Brisbane, because the walls only come open once

Kitchens, bathrooms, extensions and rewires. We check what’s behind the walls before we price it, then make sure the wiring is right before they close up again.

⭐ 5.0 Google rating · Licensed electricians · Based in Nundah

Advance Energy crew on the job

When to call us

Most renovations change how much power a home needs and where it’s used. Get the electrical sorted at the planning stage, not after the plasterer has been.

Kitchen renovation

Induction cooktop, oven, dishwasher and island bench power all need the right circuits and capacity.

Bathroom renovation

Heated towel rails, exhaust fans and new lighting, installed safely around wet areas.

Extension, granny flat or deck

New rooms, outdoor entertaining areas and second dwellings, wired for the load they’ll carry.

Old wiring found

Opened a wall and found rubber or cloth-insulated cabling? Get it checked before it’s covered again.

Renovating triggers the smoke alarm rules

A substantial renovation already requires interconnected photoelectric smoke alarms in Queensland, and every home needs them by 1 January 2027 regardless. Doing them while the ceilings are accessible is the easiest and tidiest time.

We can add them to your renovation quote. For the full rules, see the Queensland Fire Department.

How it works

We fit in around your builder, cabinet maker and other trades.

Tell us the plan

Send drawings, photos or a description of what’s changing.

Check and quote

We look at the existing wiring and switchboard, then give you a clear quote.

Rough-in, fit-off, test

The crew works to your renovation stages, tests the work and hands over your paperwork.

Common questions

Do I need to rewire my whole house?

Not always. We test what’s there and only replace what’s unsafe or won’t carry the new load, and we tell you which is which.

Will my renovation need a switchboard upgrade?

If you’re adding an induction cooktop, extra circuits or an EV charger to an older board, often yes. We check capacity before you commit.

Does a renovation trigger the smoke alarm rules?

A substantial renovation already requires interconnected photoelectric smoke alarms, and every Queensland home needs them by 1 January 2027 regardless, so it makes sense to do them while the ceilings are accessible.

Can you work alongside my builder or kitchen company?

Yes. We coordinate with your other trades so the electrical happens at the right stage.

How long does a rewire take?

It depends on the size of the home and how easy the ceiling and walls are to access. We give you a timeframe with the quote.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Your enquiry goes straight to Josh, a licensed electrician who designs and installs your system.
By submitting, you agree to Advance Energy contacting you about your quote.
Call Josh · 0474 505 395